Sunday, January 7th, 2024
Deputy Premier, Datuk Amar Dr Sim Kui Hian doing site check at Ang Cheng Ho quarry
Ang Cheng Ho old quarry site rejuvenation Phase 1 inaugural project is equipped with 20,000 square feet, air-conditioned multipurpose hall with innovation hub. Deputy Premier, Datuk Amar Dr Sim Kui Hian said it was uniquely built on top of the 20 acres water supported by a submerged 8 stories-tall supporting structures under the water He is hopefully that this will inspire the beginning of other phases to include extreme sports, rock climbing, water sports, light shows, potential hotel in the water. According to him, this is an opportunity to injectRead More
洪清河石厂湖第一期美化工程主建筑工程完成
石角洪清河石厂湖第一期美化工程主建筑工程基本完成,目前正等待巴达旺市议会签批入伙准证。 从石角大路通过该建筑物的道路也完成,一旦获得入伙准证,这栋美轮美奂的湖泊建筑物便可开放使用。 砂副总理兼石角区议员拿督阿玛沈桂贤昨日在巴达旺市议会主席陈开等陪同下,巡视工程最新进展。 随着主建筑的完成,当局为石厂湖泊积水也取得成效。沈桂贤在听取工程汇报后,对这项艰巨的工程,从施工到完成取得的顺利进行与落实,感到满意。 主建筑是向湖泊中心延伸39米宽,离湖底25米高,而长度约50米的建筑物,当局已经在室内进行了计划中的设施,包括篮球场。 在巡视工程期间,沈桂贤也使用该篮球场,并进行投篮。 25米深,约等于8层楼高,地面建筑物则有两层楼的高度;换句话,第一期主建物约有10层楼高,当中8层是在湖泊中,沈桂贤认为未来具有发展湖中酒店的潜能。 石厂美化首阶段工程耗资980万,发展计划具备19375平方尺,可容纳1000人的活动礼堂、还有篮球场及3000平方尺的作为年轻企业家创意枢纽办公室,大部分建筑物会身处湖泊中。 沈桂贤赞扬建筑团队的努力和良好配合下,进展相当顺利,它可以成为一个相当美观和吸引游客的景点。 他表示,当局将着手其他工程项目的策划,确保整个发展计划早日完成,成为另一个景点,这包括湖泊周边范围。 “这是石角其中一项休闲设施,其他设施包括石角河滨公园”。
