Clearing stagnant pond in Stampin Resettlement Scheme
The SUPP Public Complaints Bureau (SUPP PCB) was recently approached by the residents of Lorong 29 & 31, Stampin Resettlement Scheme who have complained that poor drainage condition was blocking the flow of water in a stagnant pond and causing flash flooding when it rains. As such, the residents had requested for clearing and improvement works to be carried out on the earth drains to prevent flash flooding.
The matter was immediately highlighted and brought up to the attention of Majlis Bandaraya Kuching Selatan (MBKS).
MBKS informed that they have instructed their workers to carry the drain clearing works.
Efforts are being made to bring the matter of the poor condition of the earth drains at Stampin Resettlement Scheme to the attention of the relevant authorities and hopes that the request by the residents will be solved gradually and systematically by the relevant authorities.

« 砂国阵竞选宣言出炉 (Previous News)
(Next News) Barisan Sarawak Manifesto for GE14 »
Related News
United states No deposit Bonus Online casinos slot eternal desire August 2026 The brand new Incentive
Blogs Limitation and minimum detachment limits | slot eternal desire Each day No deposit SignRead More
5 Pound Deposit Greatest Put £5 Score Added bonus Gambling arctic fortune $1 deposit enterprises
Articles Arctic fortune $1 deposit: Calculate Their Wagering for £5 Deposit Bonuses Coral Casino: BetterRead More


Comments are Closed