Dr. Sim and Lo Khere Chiang looking at the progress of the drainage system in Desa Wira.
Minister of Local Government and Housing, Datuk Dr. Sim Kui Hian, State Assemblyman for Batu Kitang, Lo Khere Chiang, Daniel Goh Thiam Ho (MPP Engineering Division Head) made a working visit to Desa Wira, Kpg Sinar Budi Baru on drainage works which is still in progress.
The drains was part of the flood mitigation plan to stop flash floods in the area.
Project cost of the 83×2 meters cost a total of RM821,854.
The crossover is 1.2 meter wide in progress are to eliminate flood in the area. The 7 months contract period will be completed by April next year.

Related News
600 SPM Candidates from Batu Kawa Attend Two-Day Examination Preparation Camp
A total of 600 students residing in the Batu Kawa constituency who will be sittingRead More
Federal laws need to be strengthen to prevent scam epidemic, says Wilfred Yap
Kota Sentosa assemblyman Wilfred Yap said the relentless rise of financial scams across Malaysia hasRead More

Comments are Closed