{"id":34504,"date":"2025-12-15T11:07:55","date_gmt":"2025-12-15T03:07:55","guid":{"rendered":"https:\/\/www.suppnewsportal.com\/main\/?p=34504"},"modified":"2025-12-16T11:09:35","modified_gmt":"2025-12-16T03:09:35","slug":"mpp-to-reconstructs-sewer-line-at-lorong-tian-ling-1-and-3","status":"publish","type":"post","link":"https:\/\/www.suppnewsportal.com\/main\/?p=34504","title":{"rendered":"MPP to Reconstructs Sewer Line at Lorong Tian Ling 1 and 3"},"content":{"rendered":"\n<p>The Padawan Municipal Council MPP will carry out reconstruction works on existing dilapidated sewer lines at Lorong Tian Ling 1 and Lorong Tian Ling 3, Taman Tian Ling.<\/p>\n\n\n\n<p>MPP Chairman Tan Kai said the project is aimed at improving the efficiency of the sewerage system while reducing the risk of infrastructure failure in the area.<\/p>\n\n\n\n<p>\u201cThis reconstruction work is necessary to ensure the sewer system functions more effectively, prevents future breakdowns and provides a cleaner and safer environment for residents living nearby,\u201d he said.<\/p>\n\n\n\n<p>According to Tan, the works will take approximately three months, beginning on 10 December 2025 and are expected to be completed by 9 March 2026.<\/p>\n\n\n\n<p>He advised members of the public to remain vigilant during the construction period and to comply with all safety instructions put in place at the work sites.<\/p>\n\n\n\n<p>\u201cWe appreciate the patience, cooperation and understanding of residents and road users affected during the implementation of this project,\u201d he added.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><a href=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_061.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"960\" height=\"430\" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_061.jpg\" alt=\"\" class=\"wp-image-34506\" style=\"aspect-ratio:2.2325581395348837;width:810px;height:auto\" srcset=\"https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_061.jpg 960w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_061-300x134.jpg 300w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_061-768x344.jpg 768w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_062.jpg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"459\" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_062-1024x459.jpg\" alt=\"\" class=\"wp-image-34505\" style=\"aspect-ratio:2.2309368191721135;width:809px;height:auto\" srcset=\"https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_062-1024x459.jpg 1024w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_062-300x135.jpg 300w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_062-768x344.jpg 768w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2025\/12\/TanKai_062.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The Padawan Municipal Council MPP will carry out reconstruction works on existing dilapidated sewer lines at Lorong Tian Ling 1 and Lorong Tian Ling 3, Taman Tian Ling. MPP Chairman Tan Kai said the project is aimed at improving the efficiency of the sewerage system while reducing the risk of infrastructure failure in the area. \u201cThis reconstruction work is necessary to ensure the sewer system functions more effectively, prevents future breakdowns and provides a cleaner and safer environment for residents living nearby,\u201d he said. According to Tan, the works will<a href=\"https:\/\/www.suppnewsportal.com\/main\/?p=34504\" class=\"read-more\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":34506,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14,1,7],"tags":[],"_links":{"self":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/34504"}],"collection":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=34504"}],"version-history":[{"count":1,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/34504\/revisions"}],"predecessor-version":[{"id":34507,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/34504\/revisions\/34507"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/media\/34506"}],"wp:attachment":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=34504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=34504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=34504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}