{"id":27812,"date":"2021-02-04T11:38:59","date_gmt":"2021-02-04T03:38:59","guid":{"rendered":"http:\/\/www.suppnewsportal.com\/main\/?p=27812"},"modified":"2021-02-04T11:39:02","modified_gmt":"2021-02-04T03:39:02","slug":"sebastian-ting-giving-rtp-for-schools-upgrading","status":"publish","type":"post","link":"https:\/\/www.suppnewsportal.com\/main\/?p=27812","title":{"rendered":"Sebastian Ting giving RTP for schools upgrading"},"content":{"rendered":"\n<p>Piasau State Assemblyman, Datuk Sebastian Ting was with JKR Engineer En. Zainol, PIBG Chairman Mr. Goh Ser Seng, Head mistress, Puan Mariam and the contractor to look at the upgrading work in SK St. Joseph Miri.<br> <br>Ting said a total of RM 100,000 was approved by Sarawak Government for the school under his Rural Transformation programme 2020 to help the school to tile the roof of the assembly hall. <br> <br>The works also include leveling of the floor, rearrange the outlet to discharge and tile the whole area.<br> <br>The contractor said he was able to finish on time before schools reopen.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2021\/02\/school_piasau_03.jpg\" alt=\"\" class=\"wp-image-27804\" width=\"434\" height=\"326\" srcset=\"https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2021\/02\/school_piasau_03.jpg 960w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2021\/02\/school_piasau_03-300x225.jpg 300w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2021\/02\/school_piasau_03-768x576.jpg 768w\" sizes=\"(max-width: 434px) 100vw, 434px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Piasau State Assemblyman, Datuk Sebastian Ting was with JKR Engineer En. Zainol, PIBG Chairman Mr. Goh Ser Seng, Head mistress, Puan Mariam and the contractor to look at the upgrading work in SK St. Joseph Miri. Ting said a total of RM 100,000 was approved by Sarawak Government for the school under his Rural Transformation programme 2020 to help the school to tile the roof of the assembly hall. The works also include leveling of the floor, rearrange the outlet to discharge and tile the whole area. The contractor said<a href=\"https:\/\/www.suppnewsportal.com\/main\/?p=27812\" class=\"read-more\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":27802,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14,1,9],"tags":[],"_links":{"self":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/27812"}],"collection":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=27812"}],"version-history":[{"count":1,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/27812\/revisions"}],"predecessor-version":[{"id":27813,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/27812\/revisions\/27813"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/media\/27802"}],"wp:attachment":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=27812"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=27812"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=27812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}