{"id":24320,"date":"2019-04-26T18:49:17","date_gmt":"2019-04-26T10:49:17","guid":{"rendered":"http:\/\/www.suppnewsportal.com\/main\/?p=24320"},"modified":"2019-04-26T19:36:55","modified_gmt":"2019-04-26T11:36:55","slug":"project-hands-over-to-contractor","status":"publish","type":"post","link":"https:\/\/www.suppnewsportal.com\/main\/?p=24320","title":{"rendered":"Project hands over to contractor"},"content":{"rendered":"<p>A project to upgrade the drains was handed over yesterday by MPP\u00a0Chairman, Lo Khere Chiang\u00a0 with MPP engineering section at Jalan\u00a0Burung Lilin.<\/p>\n<p>The drainage upgrading works will be constructing a 2 meter drain from\u00a0Jalan Burung Lilin to Jalan Burung Kawok (right side) and connect to\u00a0culvert at main road.<\/p>\n<p>The new 2 meter drain will be able to discharge water from the housing\u00a0estate area to Hui Sing Garden\u2019s stream via Jalan Burung Kawok thru\u00a0Hua Joo Park.<\/p>\n<p>This flood mitigation project by MPP is worth RM1 million and the\u00a0contractor, Lucky-Best Construction Sdn. Bhd have been given 5 months\u00a0to complete the project.<\/p>\n<p><a href=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-05.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignleft size-medium wp-image-24321\" alt=\"PHOTO-2019-04-25-15-48-05\" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-05-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-05-300x225.jpg 300w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-05-1024x768.jpg 1024w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-05.jpg 1080w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<figure id=\"attachment_24322\" aria-describedby=\"caption-attachment-24322\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-06.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-24322\" alt=\"Lo hands project to contractor.\" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-06-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-06-300x225.jpg 300w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-06-1024x768.jpg 1024w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2019\/04\/PHOTO-2019-04-25-15-48-06.jpg 1080w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-24322\" class=\"wp-caption-text\">Lo hands project to contractor.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>A project to upgrade the drains was handed over yesterday by MPP\u00a0Chairman, Lo Khere Chiang\u00a0 with MPP engineering section at Jalan\u00a0Burung Lilin. The drainage upgrading works will be constructing a 2 meter drain from\u00a0Jalan Burung Lilin to Jalan Burung Kawok (right side) and connect to\u00a0culvert at main road. The new 2 meter drain will be able to discharge water from the housing\u00a0estate area to Hui Sing Garden\u2019s stream via Jalan Burung Kawok thru\u00a0Hua Joo Park. This flood mitigation project by MPP is worth RM1 million and the\u00a0contractor, Lucky-Best Construction Sdn.<a href=\"https:\/\/www.suppnewsportal.com\/main\/?p=24320\" class=\"read-more\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":24322,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,7],"tags":[],"_links":{"self":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/24320"}],"collection":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=24320"}],"version-history":[{"count":1,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/24320\/revisions"}],"predecessor-version":[{"id":24323,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/24320\/revisions\/24323"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/media\/24322"}],"wp:attachment":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=24320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=24320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=24320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}