{"id":20727,"date":"2018-01-18T23:14:08","date_gmt":"2018-01-18T15:14:08","guid":{"rendered":"http:\/\/www.suppnewsportal.com\/main\/?p=20727"},"modified":"2018-01-19T06:51:01","modified_gmt":"2018-01-18T22:51:01","slug":"spcb-checking-on-kota-sentosa-wet-market-and-jalan-sungai-tapang","status":"publish","type":"post","link":"https:\/\/www.suppnewsportal.com\/main\/?p=20727","title":{"rendered":"SPCB: checking on Kota Sentosa Wet Market and Jalan Sungai Tapang"},"content":{"rendered":"<p>Following complaints received, Majlis Perbandaran Padawan (MPP) Chairman\u00a0 YB Cr Lo Khere Chiang and SUPP Public Complaints Bureau (SUPP PCB) Chief\u00a0 Cr Wilfred Yap was at Kota Sentosa Wet Market to make sure that the sub standard workmanship of the improvement works at the fish section was rectified.<\/p>\n<p>During the said visit, the officers from the engineering and public health sections of MPP and the contractor was also present. The contractor responsible for the improvement works at the fish section was given a stern warning by MPP on his unsatisfactory workmanship and the contractor promised to rectify all the complaints of the hawkers.<\/p>\n<p>Cr Wilfred Yap will continue to follow up and monitor the rectification works until all the works are completed by the contractor to the satisfaction of all parties.<\/p>\n<p>On another matter, residents at Lorong <a href=\"https:\/\/maps.google.com\/?q=7,+Jalan+Sungai+Tapang&amp;entry=gmail&amp;source=g\">7, Jalan Sungai Tapang<\/a> had complained that a pile of discarded wooden material in their drain was hindering the smooth flow of rain water and had requested for clearing works to be carried out.<\/p>\n<p>Following the request for assistance received, YB Cr Lo Khere Chiang, Cr Wilfred Yap together with MPP officers had gone to inspect and assess the situation and also to see what can be done to quickly resolve the problem. The problem have been solved with the clearing of the pile of discarded wooden material.<\/p>\n<figure id=\"attachment_20725\" aria-describedby=\"caption-attachment-20725\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/01\/unnamed-17.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-20725\" alt=\"MPP Chairman YB Cr Lo Khere Chiang SUPP PCB Chief, Cr Wilfred Yap, MPP officers and the representatives of the contractor in a\u00a0 discussion for the rectification works to be carried out properly at the Kota Sentosa Wet Market \" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/01\/unnamed-17-300x224.jpg\" width=\"300\" height=\"224\" srcset=\"https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/01\/unnamed-17-300x224.jpg 300w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/01\/unnamed-17-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-20725\" class=\"wp-caption-text\">MPP Chairman YB Cr Lo Khere Chiang SUPP PCB Chief, Cr Wilfred Yap, MPP officers and the representatives of the contractor in a\u00a0 discussion for the rectification works to be carried out properly at the Kota Sentosa Wet Market<\/figcaption><\/figure>\n<figure id=\"attachment_20724\" aria-describedby=\"caption-attachment-20724\" style=\"width: 189px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/01\/unnamed-25.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-20724\" alt=\"MPP Chairman YB Cr Lo Khere Chiang SUPP PCB Chief, Cr Wilfred Yap and\u00a0 MPP officers at Lorong 7, Jalan Sungai Tapang at the site where\u00a0 the discarded wooden pile was impeding water flow\" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/01\/unnamed-25-189x300.jpg\" width=\"189\" height=\"300\" srcset=\"https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/01\/unnamed-25-189x300.jpg 189w, https:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/01\/unnamed-25.jpg 619w\" sizes=\"(max-width: 189px) 100vw, 189px\" \/><\/a><figcaption id=\"caption-attachment-20724\" class=\"wp-caption-text\">MPP Chairman YB Cr Lo Khere Chiang SUPP PCB Chief, Cr Wilfred Yap and\u00a0 MPP officers at Lorong 7, Jalan Sungai Tapang at the site where\u00a0 the discarded wooden pile was impeding water flow<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Following complaints received, Majlis Perbandaran Padawan (MPP) Chairman\u00a0 YB Cr Lo Khere Chiang and SUPP Public Complaints Bureau (SUPP PCB) Chief\u00a0 Cr Wilfred Yap was at Kota Sentosa Wet Market to make sure that the sub standard workmanship of the improvement works at the fish section was rectified. During the said visit, the officers from the engineering and public health sections of MPP and the contractor was also present. The contractor responsible for the improvement works at the fish section was given a stern warning by MPP on his unsatisfactory<a href=\"https:\/\/www.suppnewsportal.com\/main\/?p=20727\" class=\"read-more\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":20724,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,7],"tags":[],"_links":{"self":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/20727"}],"collection":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20727"}],"version-history":[{"count":1,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/20727\/revisions"}],"predecessor-version":[{"id":20728,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/20727\/revisions\/20728"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/media\/20724"}],"wp:attachment":[{"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20727"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20727"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20727"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}