{"id":23377,"date":"2018-11-25T14:45:07","date_gmt":"2018-11-25T06:45:07","guid":{"rendered":"http:\/\/www.suppnewsportal.com\/main\/?p=23377"},"modified":"2018-11-25T18:23:05","modified_gmt":"2018-11-25T10:23:05","slug":"dr-sim-and-lo-khere-chiang-looking-at-the-progress-of-the-drainage-system-in-desa-wira","status":"publish","type":"post","link":"http:\/\/www.suppnewsportal.com\/main\/?p=23377","title":{"rendered":"Dr. Sim and Lo Khere Chiang looking at the progress of the drainage system in Desa Wira."},"content":{"rendered":"<p>Minister of Local Government and Housing, Datuk Dr. Sim Kui Hian,\u00a0State Assemblyman for Batu Kitang, Lo Khere Chiang, Daniel Goh Thiam\u00a0Ho (MPP Engineering Division Head) made a working visit to Desa Wira,\u00a0Kpg Sinar Budi Baru on drainage works which is still in progress.<\/p>\n<p>The drains was part of the flood mitigation plan to stop flash floods\u00a0in the area.<\/p>\n<p>Project cost of the 83&#215;2 meters cost a total of RM821,854.<\/p>\n<p>The crossover is 1.2 meter wide in progress are to eliminate flood in\u00a0the area. The 7 months contract period will be completed by April next\u00a0year.<\/p>\n<figure id=\"attachment_23378\" aria-describedby=\"caption-attachment-23378\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/11\/PHOTO-2018-11-25-14-03-59.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-23378\" alt=\"Dr. Sim and Lo seeing the progress of the drain\" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/11\/PHOTO-2018-11-25-14-03-59-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/11\/PHOTO-2018-11-25-14-03-59-300x225.jpg 300w, http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2018\/11\/PHOTO-2018-11-25-14-03-59.jpg 1008w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-23378\" class=\"wp-caption-text\">Dr. Sim and Lo seeing the progress of the drain<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Minister of Local Government and Housing, Datuk Dr. Sim Kui Hian,\u00a0State Assemblyman for Batu Kitang, Lo Khere Chiang, Daniel Goh Thiam\u00a0Ho (MPP Engineering Division Head) made a working visit to Desa Wira,\u00a0Kpg Sinar Budi Baru on drainage works which is still in progress. The drains was part of the flood mitigation plan to stop flash floods\u00a0in the area. Project cost of the 83&#215;2 meters cost a total of RM821,854. The crossover is 1.2 meter wide in progress are to eliminate flood in\u00a0the area. The 7 months contract period will be<a href=\"http:\/\/www.suppnewsportal.com\/main\/?p=23377\" class=\"read-more\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":23378,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,7],"tags":[],"_links":{"self":[{"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/23377"}],"collection":[{"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23377"}],"version-history":[{"count":1,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/23377\/revisions"}],"predecessor-version":[{"id":23379,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/23377\/revisions\/23379"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/media\/23378"}],"wp:attachment":[{"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23377"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}