{"id":10245,"date":"2016-04-16T16:46:35","date_gmt":"2016-04-16T08:46:35","guid":{"rendered":"http:\/\/www.suppnewsportal.com\/main\/?p=10245"},"modified":"2016-04-16T17:03:14","modified_gmt":"2016-04-16T09:03:14","slug":"improving-traffic-flow-at-jalan-datuk-amar-stephen-yong-link","status":"publish","type":"post","link":"http:\/\/www.suppnewsportal.com\/main\/?p=10245","title":{"rendered":"Improving traffic flow at Jalan Datuk Amar Stephen Yong Link."},"content":{"rendered":"<p>SUPP Party President\u00a0 YB Datuk\u00a0 Dr.Sim\u00a0 Kui Hian\u00a0 , MPP Chairman Cr. Lo Khere Chiang , Public Work Department\u00a0\u00a0 (JKR) Engineer ,\u00a0\u00a0 SUPP Batu Kawa Branch Chairman Mr. Tan\u00a0 Joo\u00a0 Poi, and other SUPP\u00a0 local leaders together\u00a0 inspecting the\u00a0 road project at Jalan Datuk Amar Stephen Yong\u00a0 Link.<\/p>\n<p>The road is currently under construction\u00a0 and is expected to be completed\u00a0 within two years. The total length of the improvement\u00a0 to the dual carriageway\u00a0 of road is 6 km with a total estimated cost of 42 million.<\/p>\n<p>With the road improvement\u00a0 project, the traffic lights in the area will\u00a0 also be upgraded for better traffic flow.<\/p>\n<p><a href=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY002.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignleft size-medium wp-image-10246\" alt=\"16042016SY002\" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY002-300x199.jpg\" width=\"300\" height=\"199\" srcset=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY002-300x199.jpg 300w, http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY002-1024x681.jpg 1024w, http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY002.jpg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><a href=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY003.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignleft size-medium wp-image-10247\" alt=\"16042016SY003\" src=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY003-300x199.jpg\" width=\"300\" height=\"199\" srcset=\"http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY003-300x199.jpg 300w, http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY003-1024x681.jpg 1024w, http:\/\/www.suppnewsportal.com\/main\/wp-content\/uploads\/2016\/04\/16042016SY003.jpg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SUPP Party President\u00a0 YB Datuk\u00a0 Dr.Sim\u00a0 Kui Hian\u00a0 , MPP Chairman Cr. Lo Khere Chiang , Public Work Department\u00a0\u00a0 (JKR) Engineer ,\u00a0\u00a0 SUPP Batu Kawa Branch Chairman Mr. Tan\u00a0 Joo\u00a0 Poi, and other SUPP\u00a0 local leaders together\u00a0 inspecting the\u00a0 road project at Jalan Datuk Amar Stephen Yong\u00a0 Link. The road is currently under construction\u00a0 and is expected to be completed\u00a0 within two years. The total length of the improvement\u00a0 to the dual carriageway\u00a0 of road is 6 km with a total estimated cost of 42 million. With the road improvement\u00a0<a href=\"http:\/\/www.suppnewsportal.com\/main\/?p=10245\" class=\"read-more\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":10246,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,7],"tags":[],"_links":{"self":[{"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/10245"}],"collection":[{"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10245"}],"version-history":[{"count":1,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/10245\/revisions"}],"predecessor-version":[{"id":10248,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/posts\/10245\/revisions\/10248"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=\/wp\/v2\/media\/10246"}],"wp:attachment":[{"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10245"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.suppnewsportal.com\/main\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}